SMUD SOLANO WIND FARM
|
 |
|
|
 |
|
- Installation of QTY 8 new 25Kv transformers
- Installation of the concrete slabs for transformers
- Installation of control wiring from wind turbines to controller
- Installation of secondary cabling from turbines to transformers
|
- Installation of ground grid and grounding system
- 12Kv U.G. Distribution system
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
 |
BUFFALO GAP II - NOLAN TEXAS |
 |
|
|
 |
|
- Installation of 155 new GE 1.5 MW transformers
- Installation of the concrete slabs for transformers
- Installation of control wiring from wind turbines to controller
- Installation of secondary cabling from turbines to transformers
|
- Installation of ground grid and grounding system
- 225,000 of new 35Kv U.G. Distribution System
- Fiber optic communication link to all WTG
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
 |
SLEEPING BEAR - OKLAHOMA
|
 |
|
|
 |
|
- Installation of QTY 80 GE 1.5 MW transformers
- Installation of the concrete slabs for transformers
- Installation of control wiring from wind turbines to controller
- Installation of secondary cabling from turbines to transformers
|
- Installation of ground grid and grounding system
- Fiber optic communication link to all WTG
- 90,000 of new 35Kv U.G. Distribution System
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
 |
KUMYAYEE WIND FARM - SAN DIEGO
|
 |
|
|
 |
|
- Installation of QTY 25 new 35Kv transformers
- Installation of the concrete slabs for transformers
- Installation of control wiring from wind turbines to controller
- Installation of secondary cabling for turbines to transformers
|
- Installation of ground grid and grounding system
- 60,000 of new 35Kv U.G. Distribution System
- Complete new 69-35Kv substation
- Fiber optic communication link to all WTG
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
 |
CHAMPION WIND PROJECT - ROSCOE, TEXAS
|
 |
|
|
 |
|
- 129 MW Wind Plant
- 140 MVA Substation
- 345 KV Bay Substation
- 125,000’ of Trench
- 56 Siemens 2.3 Mega Watt Turbines
- 375,000’ Under Ground Cable
|
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
 |
ROSCOE WIND FARM
- ROSCOE, TEXAS
|
 |
|
|
 |
|
- 209 Mega Watt Wind Plant
- 209 Mega Watt 1.0 Mega Watt Turbines
- 145,000’ Trench
- 450,000’ Under Ground Cable
- 2 – 140 MVA Transformers
- 280 MVA 345/354.5 8 Bay Substation
|
|
|
|
|
|